03 · Industrial Construction

Sheds engineered for the machine, not the roof.

An industrial building's structure is usually decided by what runs inside it — crane loads, vibration, clear height, floor loading. Get that wrong and the shed is unusable at full production.

Industrial clients are rarely building for its own sake. They are relocating a line, adding capacity, or meeting a customer audit — and every one of those has a hard date attached.

We build across the Chennai industrial belt including Oragadam, Sriperumbudur and Ambattur, on projects where the constraint is production continuity rather than aesthetics.

What we do

Scope of work

Factories & manufacturing plants

Ground-up production facilities with the utilities, drainage and compliance a working plant needs.

Pre-engineered sheds

PEB structures with clear spans and heights set by your equipment and material handling, not by a standard bay size.

Warehousing

Storage facilities with floor loading, dock levels and turning circles designed around your actual vehicle and racking plan.

Industrial expansion

Additional bays or floors on operating sites, sequenced so production continues.

Detail

What drives the engineering

Crane and dynamic loads

A gantry crane imposes moving loads that a static roof calculation misses entirely. Column bases get designed for surge, not just dead weight.

Floor loading and flatness

Racking and machine bases dictate slab thickness and flatness tolerance. This is specified before pour, because it cannot be corrected after.

Clear height and spans

Set by material handling and stacking, confirmed against your equipment drawings rather than assumed.

Production continuity

On operating sites, the programme runs backwards from your shutdown window. Phased handover keeps lines running.

Questions

Frequently asked

What does an industrial shed cost per sq ft?

PEB industrial sheds typically run ₹1,100–₹1,700 per sq ft in 2026 depending on clear height, crane provision and cladding specification. Heavy crane loads and high clear heights push toward the upper end.

How fast can a shed be delivered?

A straightforward 30,000 sq ft PEB shed can be delivered in around 8–10 months including foundations, subject to steel lead times. Phased handover can bring the first bay into use sooner.

Do you work on operating sites?

Yes. It changes the sequencing significantly — work is planned around shutdown windows and production access, and priced accordingly.

Talk to us about your project.

Site visit and written quotation anywhere in Chennai. We will tell you honestly if the budget does not match the brief.